Roof Measure and Site Assessment
Our metal roofing installation process runs on a four-step sequence built around accurate measurement, scheduled crew days, and a documented final walkthrough. Every 2026 Los Alamitos job starts on the roof with a tape, a moisture check of the deck, and photos of flashing points, valleys, and penetrations. We confirm pitch, panel direction, and fastener pattern before ordering material. Then you get the written estimate. Nothing gets cut until the plan and the schedule are locked in.











